Home » Engineering & Contractors » Electrical Service Requirement » Service Installation Fee
Service Installation Fee
New and Altered Service Request Application Fees
Expend the sections below to review service installation fees for each service type.
Residential
| Single - Phase, 400A or less with self- contained meter | $150.00 |
| Single - Phase, up to 800A CT meter | $200.00 |
Commercial/Industrial/Irrigation
| Single - Phase, 200A or less with self-contained meter | $150.00 |
| Single - Phase, up to 800A CT Meter | $200.00 |
| Three Phase | $300.00 |
| Primary Meter | Franklin PUD Cost |
Excess Secondary Cable - In excess of 100 feet:
| Overhead | $1.15 per foot |
| Underground | $3.35 per foot |
Residential Subdivisions
| 0 - 10 Lots | $500.00 |
| 11-20 Lots | $1,000.00 |
| 21-50 Lots | $2,500.00 |
| Greater than 50 Lots | See Note* |
| *Note: Please contact the Engineering Department |
Meter Installation
| Self - contained meter (1 Phase) | $195.00 |
| Self - contained meter (3 Phase) | $340.00 |
| Current transformer CT meter (1 Phase) | $840.00 |
| Current transformer CT meter (3 Phase) | $1,400.00 |
Secondary Service Installation
| Single - Phase, 400A, or less with self-contained meter: | |
| Overhead | $315.00 |
| Underground | $935.00 |
Metered Temporary Service - $200.00, plus metered energy used
System Capacity Fee - Residential
| Single - Phase, 400A or less with self-contained meter | $1,750.00 |
| Single - Phase, up to 800A CT meter | $2000.00 |
System Capacity Fee - Commercial/Industrial/Irrigation
| Single - Phase, 200A or less with self - contained meter | $2,500.00 |
| Single - Phase, up to 800A CT Meter | $3,500.00 |
| Three - Phase, 120/208V | $15.00 per Amp |
| Three - Phase, 277/480V | $35.00 per Amp |
| Primary Meter | Franklin PUD Cost |